Chat
x
e-Services
Get more information
FAQ
Find answers quickly
Contact Us
Get in Touch with Us!
toggle menu
e-Services
Get more information
FAQ
Find answers quickly
Contact Us
Get in Touch with Us!
toggle menu

Utility Costs

Utility Costs

Water Rates for Regional Areas

Commerce, Government Agency, State Enterprise and Industry

Volume (cubic meters)

Water rate per cubic meter

Baht

US$

0 - 10

9.50 but not less than 90.00 Baht

0.31 but not less than 2.94

11 - 20

10.70

0.35

21 - 30

10.95

0.36

31 - 40

13.21

0.43

41 - 50

13.54

0.44

51 - 60

13.86

0.45

61 - 80

14.19

0.46

81 - 100

14.51

0.47

101 - 120

14.84

0.48

121 - 160

15.16

0.49

161 - 200

15.49

0.51

Over 200

15.81

0.52

Source : Metropolitan Waterworks Authority, as of September 2019 :  www.mwa.co.th

Electricity Tariffs

Schedule 1: Residential

(Applicable to households and other dwelling places, monasteries, rectories and places of worship, including its compound through a single watt-hour meter.)

1.1 Normal Rate

Energy Charge (per kWh)

Service Charge

Baht

US$

Baht/month

US$/month

1.1.1 Consumption not exceeding 150 kWh per month

8.19

0.24

- First 15 kWh (0-15th)

2.35

0.08

- Next 10 kWh (16th-25th)

2.99

0.10

- Next 10 kWh (26th-35th)

3.24

0.11

- Next 65 kWh (36th-100th)

3.62

0.12

- Next 50 kWh (101st-150th)

3.72

0.12

- Next 250 kWh (151st-400th)

4.22

0.14

- Over 400 kWh (401st and over)

4.42

0.14

Customer, who is classified under 1.1.1, will be received free electricity for that month if consumption not exceeding 50 kWh.

1.1.2 Consumption exceeding 150 kWh per month

24.62

0.80

- First 150 kWh (0-150th)

3.25

0.11

- Next 250 kWh (151st-400th)

4.22

0.14

- Over 400 kWh (401st and over)

4.42

0.14

1.2 Time of Use Rate (TOU)

Peak (per kWh)

Off Peak (per kWh)

Service Charge

Baht

US$

Baht

US$

Baht/month

US$/month

1.2.1 At voltage level between 22-33 kV

5.11

0.17

2.60

0.08

312.24

10.19

1.2.2 At voltage level less than 22 kV

5.80

0.19

2.64

0.09

24.62

0.80

Notes:

1. Customer with installed meter less than 5 Amp, 200 V., 1 phase, 2 Wires, is classified under 1.1.1. However, if monthly consumption is over 150 kWh for 3 consecutive months, the customer will be reclassified under 1.1.2 for the following month; and if monthly consumption is not over 150 kWh for 3 consecutive months, the customer will be reclassified under 1.1.1 for the following month.

2. Customer with installed meter over 5 Amp, 220 V., 1 Phase, 2 Wires, is classified under 1.1.2.

3. As for tariff No. 1.2, if meter is installed on the low voltage side of customer’s transformer, another 2% must be added to energy consumption in order to compensate for transformer losses.

4. Tariff No. 1.2 is an optional rate, and may be switched back to Tariff No. 1.1 following a minimum use of 12 months. Moreover, the customer is obligated to pay any additional cost for the installation and removal of any equipment that requires a meter, and/ or any cost charged by the PEA.

Schedule 2: Small General Service

(Applicable to businesses, residences, industries, government institutions, local authorities, state enterprises, embassies, establishments related to foreign countries, or international organizations, etc., Including compounds with a maximum of 15-minute integrated demand of less than 30 kW through a single watt-hour meter)

2.1 Normal Rate

Energy Charge (per kWh)

Service Charge

Baht

US$

Baht/month

US$/month

2.1.1 At voltage level between 22-33 kV

3.91

0.13

312.24

10.19

2.1.2 At voltage level less than 22 kV

33.29

1.09

- First 150 kWh (0 - 150th)

3.25

0.11

- Next 250 kWh (151st - 400th)

4.22

0.14

- Over 400 kWh (401st and over)

4.42

0.14

2.2 Time of Use Rate (TOU)

Peak (per kWh)

Off Peak (per kWh)

Service Charge

Baht

US$

Baht

US$

Baht/month

US$/month

2.2.1 At voltage level between 22-33 kV

5.11

0.17

2.60

0.08

312.24

10.19

2.2.2 At voltage level less than 22 kV

5.80

0.19

2.64

0.09

33.29

1.09

Notes:

1. As for Tariff No. 2.2, if the meter is installed on the low voltage side of a customer’s transformer, another 2% must be added to energy consumption in order to compensate for the transformer’s losses.

2. Tariff No. 2.2 is an optional rate and may switched back to Tariff No. 2.1 following a minimum use of 12 months. Moreover, the customer is obligated to pay any additional cost for the installation and removal of any equipment that requires a meter, and/ or any cost charged by the PEA.

3. In any month, if the maximum integrated demand is equal to or over 30 kW, the customer will be classified under Schedule 3-5 depending on the case.

Schedule 3: Medium General Service

(Applicable to businesses, industries, government institutions, local authorities, state enterprises, embassies, establishments related to foreign countries or international organizations, including compounds with a maximum 15-minute integrated demand of at least 30 kW but less than 1,000 kW, and an average energy consumption in the last 3 consecutive months, that does not exceed 250,000 kWh per month through a single demand meter)

3.1 Normal Rate

Demand Charge (per kW)

Energy Charge (per kWh)

Service Charge (per month)

Baht

US$

Baht

US$

Baht

US$

3.1.1 At voltage level 69 kV and above

175.70

5.73

3.11

0.10

312.24

10.19

3.1.2 At voltage level between 22-33 kV

196.26

6.40

3.15

0.10

312.24

10.19

3.1.3 At voltage level less than 22 kV

221.50

7.23

3.18

0.10

312.24

10.19

Demand Charge (per kW)

Energy Charge (per kWh)

Service Charge (per month)

Baht

US$

Baht

US$

Baht

US$

3.2 Time of Use Rate (TOU)

Peak (per kWh)

Off Peak (per kWh)

3.2.1 At voltage level 69 kV and above

74.14

2.42

4.10

0.13

2.58

0.08

312.24

10.19

3.2.2 At voltage level between 22-33 kV

132.93

4.34

4.18

0.14

2.60

0.08

312.24

10.19

3.2.3 At voltage level less than 22 kV

210.00

6.85

4.32

0.14

2.64

0.09

312.24

10.19

Minimum Charge: As for Schedule 3, the minimum charge shall not be lower than 70% of the maximum demand charge during the last 12 month period ending with the current month.

Notes:

1. If the customer installs a meter on a low voltage side of his/her transformer, another 2% of kW and kWh will be added to the energy consumption to compensate for the losses in the transformer.

2. Tariff No. 3.1 is for customer who classified under tariff No. 3.1 before November 2015. The customer may switch to tariff No. 3.2 by paying for any additional cost specified by PEA, and cannot be able to switch back to tariff No. 3.1.

3. The maximum 15 minutes integrated demand is lower than 30 kW., this rate will still be applied. If the demand drops to lower than 30 kW. for 12 consecutive months and still be lower than 30 kW. in the 13th month, the customer will be reclassified under tariff No. 2.1 or No. 2.2 depend on the case. The customer who has classified under TOU rate, and has paid, will not have to pay an additional cost.

Schedule 4: Large General Service

(Applicable to Businesses, industrials, government institutions, local authorities, state enterprises, embassies, establishments related to foreign countries or international organizations, and so on, including their compound with the maximum of an average integrated demand of energy in 15 minutes in any period of time from 1,000 kW. and over or an average energy consumption in the last 3 consecutive months are over 250,000 kWh per month through a single demand meter.

4.1 Time of Day Rate (TOD)

Demand Charge (per kW)

Energy Charge

Service Charge

Peak

Partial

Off Peak

(per kWh)

(per month)

Baht

US$

Baht

US$

Baht

US$

Baht

US$

Baht

US$

4.1.1 At voltage level 69 kV and above

224.30

7.32

29.91

0.98

0

0

3.11

0.10

312.24

10.91

4.1.2 At voltage level between 12-24 kV

285.05

9.30

58.88

1.92

0

0

3.15

0.10

312.24

10.91

4.1.3 At voltage level less than 12 kV

332.71

10.86

68.22

2.23

0

0

3.18

0.10

312.24

10.91

Peak: 06.30 PM - 09.30 PM every day

Partial: 08.00 AM - 06.30 PM every day (Demand charge considers only the excess demand over peak recorded on peak period)

Off Peak: 09.30 PM - 08.00 AM every day

4.2 Time of Use Rate (TOU)

Demand Charge (per kW)

Energy Charge (per kWh)

Service Charge (per month)

Peak

Peak

Off Peak

Baht

US$

Baht

US$

Baht

US$

Baht

US$

4.2.1 At voltage level 69 kV and above

74.14

2.42

4.10

0.13

2.58

0.08

312.24

10.19

4.2.2 At voltage level between 22-33 kV

132.93

4.34

4.18

0.14

2.60

0.08

312.24

10.19

4.2.3 At voltage level less than 22 kV

210.00

6.85

4.33

0.14

2.63

0.09

312.24

10.19

Minimum Charge: As for Schedule 4, the minimum charge shall not be lower than 70% of the maximum demand charge during the last 12 month period ending with the current month.

Note:

1. Tariff No. 4.1 is for customer who classified under tariff No. 4.1 before November 2015. The customer may switch to tariff No. 4.2 by paying for any additional cost specified by PEA, and cannot be able to switch back to tariff No. 4.1.

2. The maximum 15 minutes integrated demand is lower than 1,000 kW., or the monthly energy consumption is not over 250,000 kWh., this rate will still be applied. If the demand drops to lower than 30 kW. for 12 consecutive months and still be lower than 30 kW. in the 13th month, the customer will be reclassified under tariff No. 2.1 or No. 2.2 depend on the case. The customer who has classified under TOU rate, and has paid, will not have to pay an additional cost.

Schedule 5: Specific Business Service

(Applicable to hotels, guest houses, or other businesses providing lodging to customers, including its compounds with a maximum 15-minute integrated demand of 30 kW and over on a single demand meter)

5.1 Time of Day Rate (TOD)

Demand Charge (per kW)

Energy Charge (per kWh)

Service Charge (per month)

Peak

Peak

Off Peak

Baht

US$

Baht

US$

Baht

US$

Baht

US$

5.1.1 At voltage level 69 kV and above

74.14

2.42

4.10

0.13

2.58

0.08

312.24

10.19

5.1.2 At voltage level between 22-33 kV

132.93

4.34

4.18

0.14

2.60

0.08

312.24

10.19

5.1.3 At voltage level less than 22 kV

210.00

6.85

4.33

0.14

2.63

0.09

312.24

10.19

5.2 Whom does not installed with TOU meter

Baht

US$

Baht

US$

Baht

US$

5.2.1 At voltage level 69 kV and above

220.56

7.20

3.11

0.10

312.24

10.19

5.2.2 At voltage level between 22-33 kV

256.07

8.35

3.15

0.10

312.24

10.19

5.2.3 At voltage level less than 22 kV

276.64

9.03

3.18

0.10

312.24

10.19

Minimum Charge: The minimum charge cannot be lower than 70% of the maximum demand charge in the last 12 months, ending in the current month.

Note:

1. If the customer installs a meter on a low voltage side of his/her transformer, another 2% of kW and kWh will be added to the energy consumption to compensate for the losses in the transformer.

2. Tariff No. 5.1 must be applied to all customers who are first qualified under schedule 5. While the customer who has not yet installed a TOU meter, the tariff No. 5.2 is temporarily used.

3. The maximum 15 minutes integrated demand is lower than 30 kW., or the monthly energy consumption is not over 250,000 kWh., this rate will still be applied. If the demand drops to lower than 30 kW. for 12 consecutive months and still be lower than 30 kW. in the 13th month, the customer will be reclassified under tariff No. 2.1 or No. 2.2 depend on the case. The customer who has classified under TOU rate, and has paid, will not have to pay an additional cost.

Schedule 6: Non-Profit Organization

(Applicable to Non-Government Organizations that offering non-charge services, through a single demand meter, but do not include government institutions, local authorities, state enterprises, embassies, establishments related to foreign countries and international organizations.)

6.1 Normal Rate

Energy Charge (per kWh)

Service Charge (per month)

Baht

US$

Baht

US$

6.1.1 At voltage level 69 kV and above

3.41

0.11

312.24

10.19

6.1.2 At voltage level between 22-33 kV

3.58

0.12

312.24

10.19

6.1.3 At voltage level less than 22 kV

20.00

0.65

- First 10 kWh (0 - 10th)

2.80

0.09

- Over 10 kWh (11th and over)

3.89

0.13

6.2 Time of Use Rate (TOU)

Demand Charge (per kW)

Energy Charge (per kWh)

Service Charge (per month)

Peak

Peak

Off Peak

Baht

US$

Baht

US$

Baht

US$

Baht

US$

6.2.1 At voltage level 69 kV and above

74.14

2.42

4.10

0.13

2.58

0.08

312.24

10.19

6.2.2 At voltage level between 22-33 kV

132.93

4.34

4.18

0.14

2.60

0.08

312.24

10.19

6.2.3 At voltage level less than 22 kV

210.00

6.85

4.33

0.14

2.64

0.08

312.24

10.19

Minimum Charge: As for Tariff No. 6.2, the minimum charge shall not be lower than 70% of the maximum demand charged during the last 12-month period ending with the current month.

Note:

1. If the customer installs a meter on a low voltage side of his/her transformer, another 2% of kW and kWh will be added to the energy consumption to compensate for the losses in the transformer.

2. Tariff No. 6.2 is an optional rate, in order that the customer is obligated to pay for any additional cost specified by PEA. After the minimum use of 12 months, the customer can require to be in tariff No. 6.1

Schedule 7: Agricultural Pumping

(Applicable to the electricity usage of water pumps for agricultural purposes of government, agricultural cooperatives, farmer groups that have been registered and farmer groups that are legalized by government, through a single Watt-hour meter.)

7.1 Normal Rate

Energy Charge (per kWh)

Service Charge (per month)

Baht

US$

Baht

US$

115.16

3.76

- First 100 kWh (0 - 100th)

2.09

0.07

- Over 100 kWh (101st and over)

3.24

0.11

7.2 Time of Use Rate (TOU)

Demand Charge (per kWh)

Energy Charge (per month)

Service Charge (per month)

Peak

Peak

Off Peak

Baht

US$

Baht

US$

Baht

US$

Baht

US$

7.2.1 At voltage level between 22-33 kV

132.93

4.34

4.18

0.14

2.60

0.08

204.07

6.66

7.2.2 At voltage level less than 22 kV

210.00

6.85

4.33

0.14

2.64

0.09

204.07

6.66

Minimum Charge: As for Tariff No. 7.2, the minimum charge shall not be lower than 70% of the maximum demand charge during the last 12-month period ending with the current month.

Note:

1. . If the customer installs a meter on a low voltage side of his/her transformer or PEA's transformer (only in the case of the CT is installed on the lower Voltage meter), another 2% of kW and kWh will be added to the energy consumption to compensate for the losses in the transformer.

2. Tariff No. 7.2 is an optional rate, in order that the customer is obligated to pay for any additional cost specified by PEA. After the minimum use of 12 months, the customer can require to be in tariff No. 7.1

Schedule 8: Temporary Service

(Applicable provisionally for construction uses, temporary special events, and places without a registration number, including electricity consumption that does not follow the PEA’s Rules and Regulations, through a single Watt-hour meter.)

Baht/kWh

US$/kWh

Energy Charge (at All Voltage Level)

6.80

0.22

Note: : Customer, classified under this schedule, who desires the use of alternative electricity or who is inspected by the PEA for such electricity consumption, is eligible for a change from the above schedule, for instance, businesses, industries, and households. When a customer reapplies for permanent consumption at the PEA including electricity wiring, installed interior equipment that adheres to PEA standards, and pays for any additional fees, according to PEA regulations, then the customer will be reclassified under schedule 1-7, depending on the case.

Peak:

Off-peak:

09:00 am-10:00 pm

Monday -Friday and Royal

Ploughing Ceremony Day

10:00 p.m.-09:00 a.m.

Monday-Friday and Royal Ploughing Ceremony Day

00:00 a.m.-11:59 p.m. (24 hrs.)

Saturday-Sunday, Labor Day, Public Holidays, (except compensation holidays), and the Royal Ploughing Ceremony Day, if it falls on Saturday or Sunday.

Electricity Tariffs’ Conditions

1. Power factor charge will be collected from the customer who causes the lag of power factor. When the maximum of an average reactive power (kVAR) demand in 15 minutes in any period of time is more than 61.97% of the maximum of an average active power (kW) demand in 15 minutes in any period of time, 56.07 Baht/kVAR will be added. (If the fraction of kVAR is lower than 0.5 kVAR, it will be rounded down, and if it is equal or over 0.5 kVAR, it will be rounded up to 1 kVAR.)

2. Monthly Electricity Charge is composed of the electricity tariffs which has mentioned above, Automatic Tariff Adjustment Mechanism (Ft), and VAT.

3. The electricity tariffs which has mentioned above are not excluding a Value Added Tax (VAT).

THE ABOVE ELECTRICITY TARIFFS ARE EFFECTIVE FROM THE BILLING MONTH OF NOVEMBER 2018 ONWARDS.

Source : Provincial Electricity Authority. For more information, please contact the Electricity, Business and Tariff Division. Phone: 02-590-9125, 02-590-9127, Fax: 02-590-9133-34, Call Center: 1129

Last Updated: June 30th, 2023

ขออภัยครับ ไม่มีข้อมูลส่วนนี้ ในภาษาที่ท่านเลือก !

Sorry, There is no information support your selected language !

Download และ ติดตั้งโปรแกรมอ่าน PDF

Download PDF Reader

Site map