 |
 |
 |
| 在泰國做生意
|
 |
|
 |
泰國概況 |
|
|
|
|
|
|
|
|
 |
運營成本 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
商業統計資料 |
|
| |
|
|
|
|
|
 |
關注信息 |
|
|
|
|
|
|
|
|
|
|
 |
|
|
 |
|
| |
|
 |
 |
公司成立費用 |
 |
|
|
1. Visas (government fee) (1) |
Baht |
US$ |
Work permit (process time 1-10 days) |
|
|
3 months |
750 |
21.60 |
6 months |
1,500 |
43.20 |
1 year |
3,000 |
86.40 |
2 years |
6,000 |
172.80 |
One-year visa (1-30 days) |
1,900 |
54.72 |
Re-entry visa (process time 1-2 days) |
|
|
Single entry |
1,000 |
28.80 |
Multiple entry |
3,800 |
109.44 |
1a. Visas (typical fee charged by a law firm to process) (1) |
|
|
Work permit (new) (1-14 days) |
38,000 |
1,094.38 |
Visa extension (1-30 days) |
28,000 |
806.38 |
Re-entry visa (2 days) |
2,500 |
72.00 |
2. Registration (government fee) (1) |
|
|
Company registration (21 days) |
5,500 per 1 million |
158.40 per 28,799.44 |
|
(275,000 maximum) |
(7,919.85 maximum) |
List 2 Alien business license (60 days) |
40,000-500,000 |
1,151.98-1,439.97 |
List 3 Alien business license (60 days) |
20,000-250,000 |
575.99-7,199.86 |
Factory license (30-45 days) |
500-60,000 |
14.40-1,727.97 |
3. Accounting (1) |
|
|
Tax returns and VAT |
20,000 yearly |
575.99 yearly |
Legal translation, per page |
1,400 |
40.32 |
Review/draft contracts, agreements |
40,000 up |
1,151.98 up |
4. Office achieved rents (2) |
Per square meter per month |
|
CBD/Non-CBD |
CBD/Non-CBD |
Grade A |
710/538 |
20.45/15.49 |
Grade B |
590/452 |
16.9913.02 |
5. Construction Cost (3) |
Per square meter |
Industrial Building (warehousing) |
6,600 |
190.08 |
Factory construction* |
10,800 |
311.03 |
Electrical fit-up** |
4,000 |
115.20 |
Air-conditioning*** |
3,100 |
89.28 |
General office construction**** |
27,300 |
786.22 |
|
|
|
|
|
|
General Costs
Notes: -
These rents are inclusive of management fees
and air-conditioning
- The rent-free period ranges between one to
two months
- Grade A indicates superior premises, Grade
B somewhat less so.
* 4,000
m2 as example, with 200 m2 office space, Western
sanitary ware/fit-ups, excludes cost of land,
electric fit-up and air-conditioners.
** Includes
cost of 1,000 kVA power transformer, Main and
Sub Distribution panels, general lighting,
wiring and receptacles.
*** Includes
office, restrooms, and utility areas; however,
assumes minimum 5 meter high factory/production
area.
**** Grade
B cement construction, 5 floors, 500 m2 per
floor (2,500 m2 total), aluminum framed windows/doors,
T Bar dropped ceiling for recessed lighting,
Western amenities, wide modern stairwells,
no lifts; includes cost for air conditioning
and electrical sanitary fit-ups, but not land.
Sources:
| Translation Costs |
|
|
An
A4 page of technical text typewritten
in Times New Roman size 12 or Cordia New
size 14 as applicable |
Baht |
US$ |
English-Thai |
800-1,500 |
23.04-43.20 |
Thai-English |
800-1,500 |
23.04-43.20 |
Other foreign
languages-Thai |
800-1,500 |
23.04-43.20 |
Thai-Other
foreign languages |
800-1,500 |
23.04-43.20 |
English-Other
foreign languages |
1,000-2,000 |
28.80-57.60 |
Other foreign
languages-English |
1,000-2,000 |
28.80-57.60 |
Note:
1. Professional translation services are provided from and into Thai, English, Mandarin, Japanese, Korean, Arabic, Khmer, Laotian, French, German, Spanish, Italian, Portuguese, and Latin.
2. The amount indicates a maximum quote in Thai Baht.
3. Open: Monday-Friday Time: 8.00 a.m. – 4.00 p.m.
Source: Chalermprakiet Translation and Interpretation Center, Chulalongkorn University, as of June 2009
Information Updated 30 October
2009
|
 |
|
|
 |
|
 |
|